AKEL SUNGURLU PYROLYSIS POWER PLANT INSTALLATION and COMMISSIONING

The installation of the energy side of the Pyrolysis Plant in the Organized Industrial Zone in SUNGURLU/ÇORUM, belonging to AK ENERJİ, and the commissioning of the engines were successfully completed in June 2021.

During the installation of the plant; Automation, PLC and mechanical jobs and necessary modifications of electrical energy generating engines, We; Made by EFS Energy.

The automation and PLC settings of the engines were set according to the pyrolysis fuel used, and the necessary modifications were made mechanically on the engines according to the fuel properties and they were put into operation without any problems.

All these mechanical and automation settings and arrangements have been implemented in a different way from other facilities, thanks to the previous training and experience of our team on machinery R&D and training.

The Power plant is currently operating without any problems, and fuel-related maintenance and performance evaluations are continuing, based on its periodic operations.